Grading is a balance sheet: every cubic yard cut from the high side can fill the low side, and the difference is what you haul in or out. Enter four spot levels against your design level to get the cut, the fill, the balance with compaction, the truck loads — and the drainage slope that keeps water away from the house.

Calculate grading cut & fill

Units:

Your results

200.0 cu yd
cut volume
150.0 cu yd
fill volume
27.5 cu yd surplus
net balance
2 loads
truck loads
2.4 in
drainage drop
$3,488
estimated cost

How the grading formula works

Grid: cut = area ÷ 4 × Σ positive depths ÷ 27  ·  Simple: volume = area × average depth ÷ 27  ·  Balance = cut − fill × (1 + compaction)  ·  Drop = run × grade ÷ 100

The grid method is the way grading software works: the site is divided into cells, each corner gets a depth against the design level, and the cut and fill are summed separately — positive depths are cut, negative depths are fill (streamterrain.com). A real site is rarely regular, so four corners is a planning estimate; a surveyed surface with more points is what a contractor prices from. Fill always needs a compaction allowance, because loose fill settles under its own weight and under traffic — 15% is the usual planning figure. The balance is the money: a site that balances cut against fill moves less soil off-site. For drainage, the grade is the vertical change divided by the horizontal run times 100 — 2% over 10 ft drops 2.4 in (structurestudios.com) — and the IRC asks for 6 in of fall in the first 10 ft away from a house.

Worked example

Worked example: 120 × 90 ft pad, four spot levels

A 120 × 90 ft pad with corner levels of +1.5, +0.5, −0.5 and −1.0 ft against the design level, 15% compaction, 14 cu yd trucks, moving at $8/cu yd, haul/import at $25/cu yd, drainage 2% over 10 ft:

Cross-check: streamterrain.com works the same grid arithmetic on a 40 × 30 m pad — against a design level of 102.0 m it balances at 300 m³ of cut on the high half and 300 m³ of fill on the low half. A simple-mode check from structurestudios.com: a 30 × 20 ft area raised an average of 6 in needs 30 × 20 × 0.5 ÷ 27 = 11.11 cu yd of fill. And the slope check: 2% over 50 ft drops exactly 1 ft.

A zero geometric balance is not a zero-cost balance — unsuitable cut still has to be hauled, and compacted fill still needs its allowance. Price the balance, not the volumes.

How much does grading cost? (US, 2026)

Typical 2026 US prices. "Moving" is cutting and placing soil on site; haul/import is trucking soil in or out.

ItemTypical cost (US, 2026)
Cut / fill on site, per cu yd$5-$15
Haul-off / import, per cu yd$20-$30
Residential yard grading, typical job$1,000-$3,000
Laser grading, typical job$1,500-$5,000
120 × 90 ft pad, balanced cut & fill~$3,488
US 2026 prices, checked November 2026. Sources: structurestudios.com landscape grading calculator, streamterrain.com cut and fill guide, HomeAdvisor grading costs.

Waste allowance

There is no separate waste allowance on grading — the fill compaction allowance plays that role. Loose fill settles 10-20% under compaction and traffic, so the fill you place has to be bigger than the fill the design asks for. Fifteen percent is the usual planning figure; use 10% for clean granular fill and 20% for topsoil or wet clay.

Frequently asked questions

What is cut and fill in grading?

Cut is the volume of ground you remove to reach the design surface; fill is the volume you add where the ground is below it. Together they describe the earthwork needed to turn the existing ground into the design surface — and the balance between them decides how much soil is hauled in or out.

How do I balance a grading site?

Make the cut equal the fill after the compaction allowance: balance = cut − fill × (1 + compaction). A 200 cu yd cut against 150 cu yd of fill at 15% compaction leaves 27.5 cu yd surplus. Shifting the design level up or down by a few inches is often enough to balance a small site.

What slope do I need for drainage away from the house?

At least 2% — 2.4 in of fall over the first 10 ft — and the IRC asks for 6 in of fall in the first 10 ft away from the foundation. Patios and walkways usually pitch 1-2%; driveways 2-5%. Water must always fall away from the building, never toward it.

Grid method or average-end-area — which should I use?

The grid method (this calculator) suits a yard or pad with spot levels at the corners. Average-end-area suits a road or a long run with cross-sections at stations. Both are planning methods — a surveyed surface with more points is what a contractor prices from.

Do I need a surveyor for grading?

For a house pad, a driveway or anything with a permit, yes — the design levels have to come from a survey, and the finished grade is usually checked against it. For a small yard regrade, four spot levels with a string line and a level are enough to plan from.