Rip Rap Calculator

Work out exactly how much rip rap a bank, shoreline, ditch or culvert outlet needs — in tons, cubic yards and truckloads — with the layer thickness sized from the median stone (D50) and the geotextile fabric underneath.

Calculate your rip rap

Units:

Measure the slope face, not the ground under it: the width is the distance from the toe to the top along the slope. Make the layer at least 1.5 times the median stone size (D50), and never thinner than the largest stone — this calculator uses 2 × D50, the more common recommendation for banks and shorelines. Rip rap is a planning estimate, not a spec: channels and waterway work are designed and permitted.

Your results

–
tons
–
cubic yards (with extra)
–
truckloads
–
geotextile (sq ft)

How the rip rap formula works

Rip rap is large, angular stone placed on a bank or shoreline to stop moving water eroding the soil underneath. Unlike gravel it is not graded to a single size: a load contains a range of stones, described by the median size, D50 — half the stones by weight are larger and half smaller.

Area: bank length × slope width (measured along the slope face)

Volume in cubic feet: area (sq ft) × layer (in) ÷ 12

Cubic yards: cubic feet ÷ 27

Layer thickness: 2 × D50 — the standard rule from federal and state erosion-control manuals is 1.5–2 × D50, never thinner than the largest stone

Tons: cubic yards × placed density for your stone

Truckloads: tons ÷ truck capacity, rounded up

The placed densities are the published figures: R-3 machine rip rap 1.35 t/yd³ (TrowlCalc), granite 1.50, limestone 1.45, fieldstone 1.40 and broken concrete 1.25 (GravelCalculate / HomeExpertly). Solid rock weighs about 2.2 tons per yard, but a rip rap layer is 30–40% voids, so the placed weight is much lower. The worked example matches GravelCalculate: a 50 ft shoreline with a 10 ft slope face in 9 in stone (18 in layer) is 27.8 yd³, 40.3 tons before waste, and about 46 tons with the 15% toe-trench extra — three 20-ton loads.

Worked example

A shoreline 50 ft long, 10 ft of slope face, 9 in stone (18 in layer), limestone:

Area: 50 × 10 = 500 sq ft

Volume: 500 × 18 ÷ 12 = 750 cu ft

Cubic yards: 750 ÷ 27 = 27.78 yd³

Tons: 27.78 × 1.45 = 40.28 tons

With 15% extra: 31.94 yd³, 46.32 tons

Truckloads: 46.32 ÷ 20 = 3 loads

Geotextile: 500 sq ft × $0.35 = $175

Cost: stone 46.32 × $55 = $2,548 + fabric $175 = $2,723

A 30 × 6 ft bank strip, 12 in layer of R-3 is 180 cu ft — 6.67 yd³, 7.33 yd³ with 10%, 9.90 tons (about 10 tons), 1 truckload; stone $545 + fabric $63 = $608. That matches TrowlCalc: 10 tons, about $550 of stone.

How much does rip rap cost? (US, 2026)

Prices are 2026 US ranges from GravelCalculate and TrowlCalc. Larger classes cost more to make and haul. Hauling is often priced into the per-ton rate — confirm with your quarry. Check local prices before ordering.

StonePlaced tons per yd³Typical price per ton
R-3 machine rip rap (3–6 in)1.35$40–$80
Granite1.50$45–$75
Limestone1.45$35–$60
Fieldstone1.40$30–$55
Broken concrete1.25$0–$25
Geotextile fabric (per sq ft)—$0.30–$0.50

Waste allowance

Add 15% for the toe trench and uneven placement — the standard figure for rip rap, because the toe of the slope needs a buried trench of stone and the layer is never perfectly even. Use 10% only on an even slope with careful placement. The bigger mistake is sizing the stone too small: if the water is faster than the stone can hold, the whole layer washes away — size the D50 to the flow, not to the budget.

Frequently asked questions

How thick should rip rap be?

At least 1.5 times the median stone size (D50), and never thinner than the largest stone — this calculator uses 2 × D50, the more common recommendation. A 6 in stone needs a 12 in layer, 9 in stone an 18 in layer, and 12 in stone a 24 in layer. Michigan’s erosion-control guidance sets the same 1.5 × D50 minimum, or 6 in, whichever is greater.

How many tons of rip rap are in a cubic yard?

About 1.25–1.50 tons per cubic yard placed, depending on the stone: R-3 machine rip rap 1.35, limestone 1.45, granite 1.50, fieldstone 1.40, broken concrete 1.25. Solid rock is about 2.2 tons per yard, but a rip rap layer is 30–40% voids.

How much does rip rap cost per ton?

About $35–$75 per ton at the quarry in 2026, with larger classes at the top of the range — R-3 runs $40–$80, granite $45–$75, limestone $35–$60, fieldstone $30–$55, and broken concrete $0–$25 where local rules allow it. Hauling is often priced into the per-ton rate.

Do I need fabric under rip rap?

Yes — geotextile fabric under the stone stops the soil washing out through the gaps between stones. Without it the bank erodes from underneath and the rip rap sinks. Budget about $0.35 per square foot for the fabric, the same area as the slope face.

What size rip rap do I need for a pond bank?

6–9 in median stone (D50) with a 12–18 in layer for a pond bank or culvert outlet, 12 in stone with a 24 in layer for a stream bank or lake shore, and 18 in stone with a 36 in layer for high-velocity channels. The stone size follows the water speed, not the bank size.