Work out the base for a paver patio, walkway or driveway — the compacted gravel base underneath, the bedding sand the pavers sit on, and the polymeric sand that locks the joints. The base is measured as a compacted depth, but gravel is ordered loose: compaction squeezes out the air, so you need roughly 20% more than the finished depth suggests.
Calculate your paver base
Prices: base gravel $40 per ton, bedding sand $35 per ton, polymeric sand $25 per bag. The base extends 6 in past the paved area on every side — the edge holds the pavers in and keeps them from drifting. Excavation depth is base + sand + paver thickness.
Your results
How the paver base formula works
Three materials, three formulas. The base is the only one with a compaction step — gravel ordered loose shrinks by roughly 20% when compacted.
Base depth: application depth + 2 in if frost or clay — patio 4 in, light 6 in, driveway 8 in, heavy 12 in
Base area: (length + 2 × edge ÷ 12) × (width + 2 × edge ÷ 12) — the base runs 6 in past the pavers on every side
Base, compacted: base area × depth ÷ 12 ÷ 27 in cubic yards
Base, loose: compacted × (1 + compaction) × (1 + waste), then × 1.40 t/yd³
Bedding sand: length × width × sand depth ÷ 12 ÷ 27 × (1 + waste), × 1.35 t/yd³, × 54 bags per yd³
Polymeric sand: ceil(area ÷ 75) bags — one bag covers about 75 sq ft
Excavation: base depth + sand depth + paver thickness
This is the Measure & Build / OrcaCalc method, and it reproduces their published examples: a 16 × 12 ft patio, 4 in base, 6 in edge extension, 20% compaction, 10% waste — base 3.60 yd³ loose, 5.04 tons, sand 0.65 yd³, 36 bags, 3 bags of polymeric sand, 7.4 in of excavation, $308 (Measure & Build). OrcaCalc’s 2.04 yd³ for a 12 × 12 ft patio uses the paved area only — no 6 in edge extension — so it is smaller than this calculator’s 2.64 yd³, and the page says so.
Worked example
A 16 × 12 ft patio, 4 in base, mild soil, 6 in edge extension, 1 in of bedding sand, 2.4 in pavers, 20% compaction, 10% waste:
Base area: (16 + 1) × (12 + 1) = 17 × 13 = 221 sq ft · Base depth: 4 in
Base compacted: 221 × 4 ÷ 12 ÷ 27 = 2.73 yd³ · Loose: 2.73 × 1.20 × 1.10 = 3.60 yd³ · Tons: 3.60 × 1.40 = 5.04 tons
Bedding sand: 16 × 12 × 1 ÷ 12 ÷ 27 × 1.10 = 0.65 yd³ · Tons: 0.65 × 1.35 = 0.88 tons (36 bags) · Polymeric: ceil(192 ÷ 75) = 3 bags · Excavation: 4 + 1 + 2.4 = 7.4 in
Cost: 5.04 × $40 + 0.88 × $35 + 3 × $25 = $202 + $31 + $75 = $308 — about $1.60 per sq ft
For a 12 × 12 ft patio, 15% compaction: base 2.64 yd³ loose, 3.70 tons, sand 0.49 yd³, 27 bags, 2 bags of polymeric sand, $221. And a 20 × 12 ft driveway on frost-prone clay: base depth 10 in, base 11.12 yd³ loose, 15.57 tons, sand 0.81 yd³, 44 bags, 4 bags of polymeric sand, 13.4 in of excavation, $762.
How much does a paver base cost? (US, 2026)
Prices are 2026 US ranges from Home Depot / Lowe’s listings. Check local prices before ordering.
| Item | Typical price |
|---|---|
| Crushed gravel base (ABC / #57) | $35–$45 per ton |
| Bedding sand | $30–$40 per ton |
| Polymeric sand, 50 lb bag | $20–$30 per bag |
| Geotextile fabric | $0.30–$0.60 per sq ft |
| Plate compactor rental | $60–$100 per day |
| Concrete pavers | $3–$10 per sq ft |
| Pro-installed paver patio | $15–$35 per sq ft |
Waste allowance
10% is the standard waste allowance for the base and the bedding sand — spillage, the uneven subgrade and the odd bag that gets torn. The compaction allowance is separate and already set to 20%: loose gravel shrinks by about a fifth when compacted, so the order is 1.20× the compacted volume before waste is added. Set waste to 0% only if you have already measured the area and subtracted the openings yourself.
Frequently asked questions
How much base do I need for pavers?
About 3.60 cubic yards of loose gravel (5.04 tons) for a 16 × 12 ft patio with a 4 in base — that is 2.73 yd³ compacted, before the 20% compaction allowance and 10% waste. A 12 × 12 ft patio needs about 2.64 yd³ loose (3.70 tons).
How deep should a paver base be?
4 in for a patio or walkway, 6 in for light traffic, 8 in for a driveway and 12 in for heavy traffic. Add 2 in on frost-prone or clay soil. The base should extend 6 in past the pavers on every side.
How much sand under pavers?
A 1 in layer of bedding sand — about 0.65 cubic yards (0.88 tons, 36 bags of 0.5 cu ft) for a 16 × 12 ft patio. Screed it to exactly 1 in and do not walk on it before the pavers go down.
How much polymeric sand do I need?
One 50 lb bag covers about 75 square feet of pavers. A 16 × 12 ft patio (192 sq ft) needs 3 bags; a 12 × 12 ft patio needs 2.
How much does a paver base cost?
About $308 in materials for a 16 × 12 ft patio — $202 of base gravel, $31 of bedding sand and $75 of polymeric sand, about $1.60 per square foot. A 20 × 12 ft driveway base on frost-prone clay is about $762.