Home›Cement Calculator
Cement Calculator
Work out the cement, sand and gravel for a site-mixed pour — how many 94 lb bags of Portland cement, how much sand, how much gravel, and how much water — for any mix ratio, from a slab or a known volume.
Calculate your cement
Mix ratios are parts by volume. The dry volume of the ingredients is about 1.54× the wet volume of the finished concrete — the sand and gravel have voids between the grains, and the cement paste fills them. A 94 lb bag of Portland cement is 1 ft³ of cement (94 lb/ft³), so the bag count is just the cement volume in cubic feet, rounded up.
Your results
How the cement formula works
Site-mixed concrete is a recipe by volume: cement, sand and gravel in parts. The catch is that the dry ingredients take up more room than the finished concrete — the sand and gravel have voids between the grains, and the cement paste fills them. So you multiply the wet volume by 1.54 first, then split it by the ratio.
Wet volume: ft³ = length × width × thickness (slab), or π × (diameter ÷ 2)² × height (column)
Dry volume: dry ft³ = wet ft³ × 1.54
Cement: cement ft³ = dry × cement parts ÷ total parts
Bags: 94 lb bags = cement ft³, rounded up (1 ft³ of cement = 94 lb = 1 bag)
Sand / gravel: tons = dry ft³ × parts ÷ total × 100 lb/ft³ ÷ 2,000
Water: gallons = cement lb × 0.5 ÷ 8.34 (0.5 water-cement ratio by weight)
The 1.54 dry-volume factor is the standard civil-engineering rule — and the reason many online calculators undercount cement by about a third: they split the wet volume by the ratio directly. Check it against the textbook figure: 1 m³ of 1:2:4 concrete needs about 6.5 bags of 50 kg cement (325 kg). This calculator gives 6.6 bags for 1 m³ — the same number. A 94 lb (42.6 kg) bag of Portland cement is 1 ft³ of cement at 94 lb/ft³, so the bag count is just the cement volume in cubic feet.
Worked example
A patio slab 10 × 10 ft, 4 in thick, at the general-purpose 1:2:4 mix:
Wet volume: 10 × 10 × 0.333 = 33.33 ft³ (1.23 yd³)
Dry volume: 33.33 × 1.54 = 51.33 ft³
Cement: 51.33 ÷ 7 = 7.33 ft³ → 8 bags of 94 lb cement
Sand: 51.33 × 2 ÷ 7 = 14.67 ft³ × 100 lb = 1,467 lb = 0.73 tons
Gravel: 51.33 × 4 ÷ 7 = 29.33 ft³ × 100 lb = 2,933 lb = 1.47 tons
Water: 8 × 94 × 0.5 ÷ 8.34 = 45 gallons
Cement cost: 8 × $14 = $112
A 20 × 20 ft slab, 4 in thick, at 1:2:4 is 133.33 ft³ wet — 205.33 ft³ dry — 30 bags of cement, 2.93 tons of sand and 5.87 tons of gravel. At the lean 1:3:6 mix the same slab takes only 21 bags of cement but 3.08 tons of sand and 6.16 tons of gravel; at the strong 1:1.5:3 mix it takes 38 bags.
How much do cement, sand and gravel cost? (US, 2026)
Prices are 2026 US retail ranges. Bulk sand and gravel are sold by the ton at the yard; bagged sand is sold by the 50 lb bag at the retailer. Check local prices before ordering.
| Item | Typical price |
|---|---|
| Portland cement, 94 lb bag | $12–$16 |
| Portland cement, 50 kg bag (UK/CA/AU) | $10–$14 |
| Sand, bulk (yard) | $30–$50 per ton |
| Sand, 50 lb bag | $4–$6 |
| Gravel / crushed stone, bulk | $35–$60 per ton |
| Ready-mix concrete, delivered (for comparison) | $125–$200 per yd³ |
Waste allowance
Add 5% for spillage and mixing loss — the standard figure for site-mixed concrete. Use 10% on uneven forms or rough work, where the pour always takes more than the drawing says. Do not add waste twice: the 1.54 dry-volume factor already accounts for the voids in the aggregates — the waste % here is only for spillage and over-dig.
Frequently asked questions
How many bags of cement for a 10x10 slab?
A 10 × 10 ft slab, 4 in thick, at the general-purpose 1:2:4 mix needs 8 bags of 94 lb Portland cement, plus 0.73 tons of sand and 1.47 tons of gravel. The dry volume is 51.33 ft³ (wet 33.33 ft³ × 1.54), and cement is one-seventh of it — 7.33 ft³, rounded up to 8 bags.
What is the 1:2:4 mix ratio?
One part cement, two parts sand, four parts coarse aggregate, by volume. It is the general-purpose mix for slabs, footings and driveways (about 3,000 psi). 1:1.5:3 is stronger (about 4,000 psi, for columns and beams) and 1:3:6 is lean (about 2,000 psi, for mass fill and blinding).
How much sand and gravel per bag of cement?
At 1:2:4, one 94 lb bag of cement (1 ft³) goes with about 2 ft³ of sand (200 lb) and 4 ft³ of gravel (400 lb). In tons: a 10 × 10 × 4 in slab takes 8 bags of cement, 0.73 tons of sand and 1.47 tons of gravel.
Why multiply by 1.54 for dry volume?
Dry sand and gravel have voids between the grains — about 35% of their volume is air. The cement paste fills those voids, so the dry ingredients take up about 1.54× the volume of the finished concrete. Calculators that skip this factor undercount cement by about a third.
Is cement the same as concrete?
No. Cement is the binder — the grey powder. Concrete is cement + sand + gravel + water, mixed and hardened. A bag of "concrete mix" from the store already contains all three dry ingredients; a bag of "Portland cement" is only the binder, and you add your own sand and gravel.