Home›Mortar Calculator
Mortar Calculator
Work out how many bags of mortar a brick or block wall needs — premixed bags, or site-mixed masonry cement and sand. Based on the manufacturers’ own coverage data, so the bag count is the real one.
Calculate your mortar
One 80 lb bag of premixed mortar (Sakrete / QUIKRETE data sheets) yields about 0.6–0.7 ft³ and lays 35–37 standard bricks or 12 blocks. Site-mixed mortar is different: one 70 lb bag of masonry cement lays about 144 bricks or 100 blocks — but needs sand added (about 2.5 ft³ of sand per cement bag).
Your results
How the mortar formula works
There are two different products called “mortar”, and they cover very different amounts. Getting them mixed up is the most common mistake in mortar estimating.
Premixed mortar (80 lb bag, just add water) — yields about 0.6–0.7 ft³ and lays 35–37 standard bricks or 12 blocks (Sakrete / QUIKRETE data sheets; Amerimix data sheet: one 80 lb bag yields ~0.78 cu ft, lays up to 12 blocks or 36 bricks)
Bags (premix) = ceil(units × (1 + waste %) ÷ units per bag)
Site-mixed mortar (70 lb masonry cement + sand) — one bag of masonry cement lays about 144 bricks or 100 blocks, and needs about 2.5 ft³ of sand per bag (Quikrete technical data; trade rule of 3 bags per 100 blocks)
Masonry cement bags = ceil(units × (1 + waste %) ÷ 144 or 100) · Sand = cement bags × 2.5 ft³
A 60 lb premixed bag covers about three quarters of an 80 lb bag — 27 bricks or 9 blocks. Mortar joints are normally 3/8 in; wider joints (1/2 in) use about a third more mortar. The Brick Calculator on this site uses the same 35-bricks-per-bag figure, so the two tools agree.
Worked example
A wall of 1,000 modular bricks, premixed 80 lb bags, 5% waste:
Bags: 1,000 × 1.05 ÷ 35 = 30 → 30 bags
Mortar volume: 1,000 × 1.05 × 0.65 ÷ 35 = 19.5 ft³ (about 0.72 yd³)
Cost at $9 per bag: 30 × $9 = $270
Site-mixed instead: 1,000 × 1.05 ÷ 144 = 7.3 → 8 bags of masonry cement + 8 × 2.5 = 20 ft³ of sand
For 100 blocks at 10% waste: 100 × 1.10 ÷ 12 = 9.2 → 10 bags of 80 lb premixed mortar. The same 100 blocks site-mixed need 2 bags of masonry cement (100 × 1.10 ÷ 100 = 1.1 → 2) plus 5 ft³ of sand.
How much does mortar cost? (US, 2026)
Prices are 2026 US retail ranges (Home Depot / Lowe's lists). Prices vary by region; check local prices before ordering.
| Item | Typical price |
|---|---|
| 80 lb premixed mortar bag | $7–$10 |
| 60 lb premixed mortar bag | $6–$8 |
| 70 lb masonry cement bag | $10–$14 |
| Masonry sand, bulk | $40–$70 per yd³ |
| Masonry sand, 50 lb bag | $4–$7 |
Waste allowance
Add 5% for spilled mortar, joints and the mortar left in the mixer — the standard figure. Use 10% with many cuts, an inexperienced crew, or hot weather that dries mortar fast. A 3/8 in joint is assumed; a 1/2 in joint needs about 30% more mortar, so bump the waste up or order an extra bag.
Frequently asked questions
How much mortar do I need for 100 bricks?
About 3 bags of 80 lb premixed mortar — one bag lays about 35 standard bricks (1,000 × 1.05 ÷ 35 = 30 bags per 1,000 bricks, so 100 bricks need 3). With 5% waste, order 3 bags for 100 bricks or 30 bags for 1,000.
How many bags of mortar per 1000 bricks?
About 30 bags of 80 lb premixed mortar (1,000 ÷ 35 = 28.6, plus 5% waste = 30). Site-mixed, it is about 8 bags of 70 lb masonry cement plus 20 ft³ of sand.
How many bags of mortar per 100 blocks?
About 9–10 bags of 80 lb premixed mortar — one bag lays about 12 blocks (100 ÷ 12 = 8.3, plus 10% waste = 10). Site-mixed, it is about 2 bags of masonry cement plus 5 ft³ of sand.
How much mortar is in an 80 lb bag?
About 0.6–0.7 ft³ of mixed mortar (Amerimix lists 0.78 ft³). That is enough for about 35–37 standard bricks or 12 concrete blocks.
What is the difference between mortar mix and masonry cement?
Mortar mix (premixed) already contains sand — just add water. Masonry cement contains no sand: you add about 2.5 ft³ of sand per 70 lb bag, and it goes much further (about 144 bricks per bag against 35 for premix).