Labor Cost Calculator

A wage is not what a worker costs. Payroll tax, workers comp, insurance and downtime add 25-40% on top of the hourly wage before the worker lifts a tool — and the rate you charge a client has to cover that, plus overhead and profit, on only the hours you can actually bill. Pick a trade, a crew and the hours, and this calculator turns the wage into the true loaded cost, the overtime cost, and the hourly rate to charge.

Calculate labor cost

Units:

Your results

$3,494.40
base wages
$1,048.32
payroll burden
$0.00
overtime cost
$4,542.72
total labor cost
$37.86/hr
loaded rate
$105/hr
rate to charge

How the labor cost formula works

Base wages = wage × crew × hours  ·  Loaded rate = wage × (1 + burden%)  ·  Total labor cost = (base wages + overtime at 1.5×) × (1 + burden%)  ·  Rate to charge = loaded rate ÷ billable share ÷ (1 − overhead − profit)  ·  Crew-hours (productivity) = quantity ÷ production rate

The whole method is one line (skillmammoth.com): the rate to charge equals the wage times one plus burden, divided by the billable share, divided by one minus overhead and profit. Burden is everything paid on top of the base wage — FICA 7.65%, unemployment insurance, workers comp and fringe benefits — typically 25-40%. The billable share is the fraction of paid hours a client actually pays for, about 60% on a typical crew; the rest is travel, weather and admin. Overtime is anything past 40 hours in a workweek, paid at 1.5 times the wage. In productivity mode the hours come from the job instead of the schedule: crew-hours equal the takeoff quantity divided by the production rate (buildvisionai.com), and labour hours equal crew-hours times headcount.

Worked example

Worked example: 3 carpenters for one week

A 3-person carpenter crew, 40 regular hours, BLS median wage $29.12/hr, 30% burden, 30% overhead, 10% profit, 60% billable:

Cross-check: estimationpro.ai prices a 3-person crew at $38/hr working 8-hour days at $912 per day in base wages, and with a 30% burden rate the real cost is $1,186 per day. Set the wage to $38, the crew to 3 and the hours to 8 in this calculator and it gives $912.00 base, $273.60 burden and $1,185.60 total — $1,186 rounded. A second check from buildvisionai.com, in productivity mode: hanging 4,800 sq ft of drywall at 120 sq ft per crew-hour is 40 crew-hours, and 2 hangers at $28/hr is 80 labour hours; at a 31.65% burden the loaded rate is $36.86/hr and the labour cost is $2,948.96 — switch modes and enter those numbers to reproduce it exactly.

Wages are national medians: licensed shops bill homeowners $50-$150/hr for electrical and plumbing work, which is a billing rate, not a wage. Replace every default with your own payroll numbers before you bid.

What do construction trades earn? (US, 2026)

BLS Occupational Employment & Wage Statistics, May 2025 national medians, read November 2026. These are wages, not billing rates — a licensed shop bills $50-$150/hr for electrical and plumbing work.

TradeMedian wageLoaded at 30% burdenRate to charge*
Electrician$30.38/hr$39.49/hr$110/hr
Plumber$30.67/hr$39.87/hr$111/hr
HVAC technician$29.33/hr$38.13/hr$106/hr
Carpenter$29.12/hr$37.86/hr$105/hr
Sheet metal worker$29.71/hr$38.62/hr$107/hr
Cement mason$27.41/hr$35.63/hr$99/hr
Roofer$26.65/hr$34.64/hr$96/hr
Painter$23.75/hr$30.88/hr$86/hr
Laborer / helper$22.66/hr$29.46/hr$82/hr
Landscaper$18.82/hr$24.47/hr$68/hr
*Rate to charge = loaded rate ÷ 60% billable ÷ (1 − 30% overhead − 10% profit). Sources: BLS OEWS May 2025, skillmammoth.com labor rate calculator (read 16 Nov 2026).

Waste allowance

There is no waste percentage on labour — the allowance to plan for is the payroll burden, which runs 25-40% on top of base wages: FICA 7.65%, unemployment insurance, workers comp (often 15% of payroll for roofing and framing) and fringe benefits. In June 2026, benefits added $15.84 to $36.13 per hour worked in construction, equal to 43.8% of wages (BLS Employer Costs for Employee Compensation). A crew that looks cheap at $29/hr costs $37.86/hr loaded, and $105/hr to charge once overhead, profit and non-billable time are counted.

Frequently asked questions

How do you calculate construction labor cost?

Multiply the hourly wage by crew size and hours for base wages, then add the payroll burden (25-40%) and overtime at 1.5x. A 3-person carpenter crew at the $29.12/hr BLS median for 40 hours costs $3,494.40 in base wages and $4,542.72 loaded at 30% burden.

What is labor burden in construction?

Everything paid on top of the base wage: FICA 7.65%, unemployment insurance, workers comp and fringe benefits. It typically adds 25-40% — a $29.12/hr carpenter costs $37.86/hr loaded at 30% burden. Workers comp alone can be 15% of payroll for roofing and framing.

What hourly rate should a contractor charge?

Rate to charge = loaded rate divided by the billable share, divided by one minus overhead and profit. An electrician at the $30.38 median wage needs about $110/hr at 30% burden, 60% billable, 30% overhead and 10% profit — 3.6 times the wage (skillmammoth.com).

How do I estimate labor hours for a job?

Use your own job-costing history first. Otherwise use a production rate: crew-hours equal the takeoff quantity divided by the rate, and labour hours equal crew-hours times headcount. Hanging 4,800 sq ft of drywall at 120 sq ft per crew-hour is 40 crew-hours, or 80 labour hours for a 2-person crew.

How is overtime calculated for construction workers?

Anything past 40 hours in a workweek is paid at 1.5 times the wage. Eight overtime hours for one worker at $29.12/hr cost $349.44 in wages before burden — $29.12 x 1.5 x 8 — plus the 30% burden on top of that. Multiply by the crew size for the whole crew.